Organisation
|
Projects
|
|
Africon
|
Jumeira water supply system in Dubai. Assisting in assessment of pipe failures
|
|
BKS
|
Assisting in various pipeline system analyses
|
|
EVN
|
Assessment of dynamic pressures of the Majosi bulk water supply pipeline
|
|
Golder Associates Africa
|
Phalaborwa De-watering system dynamic pressure evaluation
|
|
Jaco Swart Consulting Engineers
|
Hydraulic assessment and surge analysis of the Blyde River Irrigation Scheme. Contract value of construction is R120 Million
|
|
Kwezi V3 Engineers
|
Roodeplaat Dam to Wallmansthal raw water pipeline dynamic pressure analyses
|
|
LawGibb
|
Hoxane bulk water transport pipeline. Surge and pipe optimization of booster pumping system.
|
|
MVD Consulting Engineers (South Cape)
|
Surge analyses, air valve and pipeline analyses (George Le Grande pipeline, Groot Brak Water supply scheme, Murraysburg pipeline, Pacaltsdorp Irrigation Scheme).
|
|
Ndodana Consulting Engineers
|
Review of various hydraulic designs and storm water systems analyses. These include Kimberley Airport, Storm Water Drainage System crossing the Katlehong - Kwesini railway section,
T15 provincial road in Eastern Cape,
|
|
Ninham Shand Consulting Engineers
|
Air valve sizing and positioning analysis (3 m diameter Gurara Transfer Scheme). Maguga weir model study.
|
|
Nyeleti Consulting Engineers
|
Pipeline analyses and design reviews (Malematja Water Supply scheme).
|
|
Petronet
|
Surge analysis of the Petronet refined products pipeline from Durban to Sasolburg. Total distance of 780 km and 14 pump stations. In collaboration with Africon Pty Ltd.
|
|
Stewart Scott International
|
Dubaydib well field design of valve control system
|
|
Rand Water
|
Surge analyses of the B4, B6 & B10 pipeline systems
Preliminary review of the Lesotho transfer pipeline (Surge analyses, Clarens pipeline 3,5 m diameter)
|
|
South African National Road Agency Limited (SANRAL)
|
Updating of the old Road Drainage Manual
Review of the N8 Kaalspruit River Bridge (Hydraulic and hydrological aspects)
Hydrological and hydraulic analyses of the Tsitsa Low Level River Bridge
|
|
Vektor Ingenieurs
|
Far East Hospital and Tambo Memorial Hospital site water reticulation design
|
|
WRP Consulting Engineers
|
Conceptual design and sizing of the Khayelitsha pressure control system
|
|
WSP International Sweden
|
Hydraulic Analysis of the Zambezi River for the construction of the 2.5 km long Caia River Bridge. This included the review of previous studies, setting-up of hydraulic model,
assessing various bridge options and scour analyses for the preliminary design report.
|